Brookair Danfab, Nottingham

Site Location

Loughborough

Contractor

Brookair Danfab, Nottingham, UK

Scope

Logicool were approached to provide a quick turnaround solution to provide equipment for a critical testing lab. The site was ready to go with concerns about the existing Air Conditioning solution as the site is a critical medical test facility. Logicool proposed a Mitsubishi Electric Design and Build solution to match the exact requirements of the facility including technical challenges as well as on-site services.

Equipment

Five Mitsubishi Electric Mr. Split Systems

Ten Mitsubishi Electric Y Series Heat Pump Systems

Six Mitsubishi Electric R2 Series Heat Recovery Systems

Mitsubishi Electric AE-200 Central Controller

Sixteen Mitsubishi Electric Mr. Slim AHU Interface solutions service Five Air Handling Units

Modbus and BACNet Interfaces

Services

Design Assistance

Commissioning Assistance

Support to BMS Partner enabling integration of Modbus and BACNet

Management of logistics challenges to enable plant delivered in time for six-week installation window